I have 283 block that is currently 40 over. I was talking with my machinist and he suggested going to 60 over. I was thinking about sleeveing it. He stated that it would be $100 per cylinder plus sleeves and that they do all or none.
Other than the cost, what are the pros and cons of sleeveing?
I really want to get this rebuild correct. The car is a no shown, nice day, fun driver. The engine won't be used hard, but I want something in there that will last.
Other than the cost, what are the pros and cons of sleeveing?
I really want to get this rebuild correct. The car is a no shown, nice day, fun driver. The engine won't be used hard, but I want something in there that will last.
Comment