Does anyone have an explanation for how a '67 St. Louis body car with a trim tag date code H22 (March 22) would legitimately have an official production date 9 days later on March 31, 1967? The March 31 date is per the NCRS Shipping Data Report. I am understanding there is typically only 1-3 days between the body build date and the final assembly production date. As further information, the engine stamp (TO32IJE) shows March 21 production which I understand is not unreasonable.
'67 With 9 Days Between Body Build and Final Assy
Collapse
X
-
-
Re: '67 With 9 Days Between Body Build and Final Assy
Thanks Mark. The Shipping Data Report was order #15852. The St. Louis Chapter VIN and Trim Tag Decoder agrees with the March 31, 1967, on the NCRS Shipping Data Report. The car has not been judged.- Top
Comment
-
Re: '67 With 9 Days Between Body Build and Final Assy
Besides the repair possibility that Reba noted, I recall reading mention of 'dealer financing' issues causing a production delay... then again, my recollection might be inkorrect. In any event, I like the engine assembly date fitting more in line with the LATER (3-31) production date.- Top
Comment
-
Re: '67 With 9 Days Between Body Build and Final Assy
H22 Build Trim Tag for March 31 final assy.
H22 Body 31 March Final Assy IMG_1103 (002).JPG- Top
Comment
-
Re: '67 With 9 Days Between Body Build and Final Assy
That image is fairly small/low-res for a critical evaluation... other may have a different opinion.
For comparison, some of the 67 Trim Tag info I've saved, from St Louis Convertibles:
H22 - S6829 - 194677S11452X
H27 - S6879 - 194677S11470X
H30 - S7000 - 194677S11512X
Does your VIN fit in with this group?- Top
Comment
-
Re: '67 With 9 Days Between Body Build and Final Assy
That image is fairly small/low-res for a critical evaluation... other may have a different opinion.
For comparison, some of the 67 Trim Tag info I've saved, from St Louis Convertibles:
H22 - S6829 - 194677S11452X
H27 - S6879 - 194677S11470X
H30 - S7000 - 194677S11512X
Does your VIN fit in with this group?- Top
Comment
-
Re: '67 With 9 Days Between Body Build and Final Assy
Dan,
Post a high resolution picture of your stamp pad for comments. It was nice meeting you the convention as I mentioned at the convention with the engine assembly date of 3/21 being 1 day before the body build date of 3/22 it's almost impossible as the big blocks were built in Tonawanda. I suspect the original engine may have had a mechanical issue which would explain why the NCRS shipping date shows 3/31 as the cars original engine was being replaced. Typically you see 1-6 weeks before the body build date on Big Blocks engine assembly date. I have seen small blocks with 1-2 days before body build date as the those engines were built in Flint.
You have a great looking car.
Mike- Top
Comment
-
Re: '67 With 9 Days Between Body Build and Final Assy
Dan,
Post a high resolution picture of your stamp pad for comments. It was nice meeting you the convention as I mentioned at the convention with the engine assembly date of 3/21 being 1 day before the body build date of 3/22 it's almost impossible as the big blocks were built in Tonawanda. I suspect the original engine may have had a mechanical issue which would explain why the NCRS shipping date shows 3/31 as the cars original engine was being replaced. Typically you see 1-6 weeks before the body build date on Big Blocks engine assembly date. I have seen small blocks with 1-2 days before body build date as the those engines were built in Flint.
You have a great looking car.
Mike
Engine Stamp for H22 Body and March 31 Final Assy.jpg- Top
Comment
Comment