    Plant Shut down in October 62 ?

    November not October.

    In November of 1962 there were a few weeks where there were very few cars built. I have copies of hundreds of 63 trim tags and have never seen one for week three or four. I am not saying they do not exist, but if they do there were very few cars built.

    I own a car that was built on Thursday of week two (November of 1962). Just a few hundred vin numbers later is week five car. And 195 on the body number. Does anybody know exactly what happened for those few weeks in October of 1962.

    For those that do not know or have forgotten, in 63 they gave us the week we were built only. no days.
    Thank,
    M
    Last edited by Monte M.; April 26, 2012, 09:22 PM.
  • Gary F.
    Expired
    • August 29, 2010
    • 248

    #2
    Re: Plant Shut down in October 62 ?

    Is that around the time they had the run of Z06's, or was it earlier. Maybe somebody with a Z06 can chime in, or someone who has a list of serial numbers. 2 weeks should be at least a couple hundred cars.

    Comment

    • Michael H.
      Expired
      • January 29, 2008
      • 7477

      #3
      Re: Plant Shut down in October 62 ?

      Originally posted by Monte Marin (18651)
      November not October.

      In November of 1962 there were a few weeks where there were very few cars built.
      Thank,
      M
      Monte,

      You are correct. There was a "work stoppage" (not a strike) in late November 1962 at the St Louis Corvette plant. I don't know exactly how long it lasted but dealers were advised that orders scheduled for late Nov would be produced in early December.
      I would guess that the "work stoppage" only lasted a week to 10 days.

      Comment

      • John H.
        Beyond Control Poster
        • December 1, 1997
        • 16513

        #4
        Re: Plant Shut down in October 62 ?

        That was a local Fisher Body/Chevrolet strike at the passenger/truck plant, which also took down the Corvette plant (same local union for both plants) from November 13th through the 21st.

        Comment

        • Timothy B.
          Extremely Frequent Poster
          • April 30, 1983
          • 5186

          #5
          Re: Plant Shut down in October 62 ?

          Monte,

          My 63 coupe is built C2 on the trim tag and serial # 031XX. I don't know the body # as I removed it long ago when I didn't know any better. Maybe your car body # could help me back in to mine.

          Comment

          Working...
          Searching...Please wait.
          An unexpected error was returned: 'Your submission could not be processed because you have logged in since the previous page was loaded.

          Please push the back button and reload the previous window.'
          An unexpected error was returned: 'Your submission could not be processed because the token has expired.

          Please push the back button and reload the previous window.'
          An internal error has occurred and the module cannot be displayed.
          There are no results that meet this criteria.
          Search Result for "|||"