65 Frame Pull Date M/D/Y or D/M/Y? - NCRS Discussion Boards

65 Frame Pull Date M/D/Y or D/M/Y?

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • Michael S.
    Expired
    • June 7, 2007
    • 82

    65 Frame Pull Date M/D/Y or D/M/Y?

    There has been a lot of discussion on frame pull dates but after reading a number of threads, I am still not sure how to write down the frame pull date on my 65. A photo in Noland Adam's book shows a frame pull date written as day/month/year but discussion in some NCRS threads says it should be written as month/day/year. Which is correct or could it have been written either way? Thanks for any clarification.
  • Michael G.
    Extremely Frequent Poster
    • December 31, 1996
    • 1251

    #2
    Re: 65 Frame Pull Date M/D/Y or D/M/Y?

    Michael,

    Believe you discover the correct sequence of numbers for the pull date are:
    Month/Day/Year.

    Michael
    28614

    Comment

    • Michael H.
      Expired
      • January 28, 2008
      • 7477

      #3
      Re: 65 Frame Pull Date M/D/Y or D/M/Y?

      Originally posted by Michael Sparr (47439)
      There has been a lot of discussion on frame pull dates but after reading a number of threads, I am still not sure how to write down the frame pull date on my 65. A photo in Noland Adam's book shows a frame pull date written as day/month/year but discussion in some NCRS threads says it should be written as month/day/year. Which is correct or could it have been written either way? Thanks for any clarification.
      Michael,

      We've seen several original examples written either way. My April 65 frame was dated 4/19/65.
      However, a St Louis assembly plant photo of frames on the frame line in late 1965 (early 66 model year) were dated DD/MM/YY.
      I think the difference was probably due to different workers preference.

      Comment

      • Michael G.
        Extremely Frequent Poster
        • December 31, 1996
        • 1251

        #4
        Re: 65 Frame Pull Date M/D/Y or D/M/Y?

        Regarding frame pull dates.......what was the average time for a frame pull from storage as it relates to build date of the car? How many days before?

        Michael

        Comment

        • John H.
          Beyond Control Poster
          • November 30, 1997
          • 16513

          #5
          Re: 65 Frame Pull Date M/D/Y or D/M/Y?

          Originally posted by Michael Gill (28614)
          Regarding frame pull dates.......what was the average time for a frame pull from storage as it relates to build date of the car? How many days before?

          Michael
          The same day or not more than one working day prior to the day the car came off the line.

          Comment

          • Michael S.
            Expired
            • June 7, 2007
            • 82

            #6
            Re: 65 Frame Pull Date M/D/Y or D/M/Y?

            Thanks for the responses. I am going to use the MM/DD/YY sequence and use the build date as the pull date I put on the frame.
            Mike

            Comment

            Working...
            Searching...Please wait.
            An unexpected error was returned: 'Your submission could not be processed because you have logged in since the previous page was loaded.

            Please push the back button and reload the previous window.'
            An unexpected error was returned: 'Your submission could not be processed because the token has expired.

            Please push the back button and reload the previous window.'
            An internal error has occurred and the module cannot be displayed.
            There are no results that meet this criteria.
            Search Result for "|||"