Re: Distributor tag date- lead time?
Maybe someone can answer the traditional lag time between casting date and assembly date. We have a very late production 72 LT1 (26756), which we believe was produced the final days of the 72 production run. Our engine (Tonawanda) has a casting dated F1072 and our disbutor code is dated 2E26. So by my math our distributor date of May 26 is 16 days prior to the engine casting date. Not sure if that is any help.
Fred
Maybe someone can answer the traditional lag time between casting date and assembly date. We have a very late production 72 LT1 (26756), which we believe was produced the final days of the 72 production run. Our engine (Tonawanda) has a casting dated F1072 and our disbutor code is dated 2E26. So by my math our distributor date of May 26 is 16 days prior to the engine casting date. Not sure if that is any help.
Fred
Comment