1964 Body Build Dates - NCRS Discussion Boards

1964 Body Build Dates

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • COURT TREUTH

    1964 Body Build Dates

    Is it possible for the Body Build Date to preceed the casting and stamping dates on the drivetrain? The trim tag indicates the body was assembled in the A.O. Smith plant approximately 6 weeks before the engine code and engine casting dates.
  • Mike Cobine

    #2
    Re: 1964 Body Build Dates

    Sure. The body had to be shipped to St. Louis and then it could sit outside awaiting a chance to go in. Now 6 weeks might be a bit long, but if you have a car that is unrestored and that way, then it could be.

    Comment

    Working...
    Searching...Please wait.
    An unexpected error was returned: 'Your submission could not be processed because you have logged in since the previous page was loaded.

    Please push the back button and reload the previous window.'
    An unexpected error was returned: 'Your submission could not be processed because the token has expired.

    Please push the back button and reload the previous window.'
    An internal error has occurred and the module cannot be displayed.
    There are no results that meet this criteria.
    Search Result for "|||"